Transformer System Panel / Electrical Machine Trainer / Electrical Machine Lab

FOB Reference Price:Get Latest Price
$2,100.00 - $3,000.00 / Units | 1 Unit/Units (Min. Order)
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Maharashtra, India
Brand Name:
Kitek
Model Number:
KEE-01
Certifications:
ISO9001:2015
Supply Ability
Supply Ability:
100 Piece/Pieces per Month
Packaging & Delivery
Packaging Details
Export Packaging Quality.
Product packaged in corrugated box with all side cushions.
Port
Mumbai

Specifications:

  • Machine trainer having control panel should provided in 40X40mm Allumunium profile rack with sturdy table top flat panel .
  • Should have 6 no's of ABS plastic panel mounted on the aluminum rack with mimic diagram
  • All input & output are terminated in 4mm shrouded connector, Should provide 4mm banana cable for experiments.
  • Should have 3phase DOL starter 4pole MCB, contractor & relay panel
    - 4 pole MCB of 415 V/4A .
    - DOL 9A Contactor with 230V / 50 Hz / 11VA COIL .
    - Bimetallic thermal O/L relay with range 1.4A - 2.3A
  • Should have 3 phase multifunction meter panel (2nos).
    - Bidirectional Multifunction
    - 3 Phase ¾ wire, 415V, CT Input 5A
    - LCD/LED display, Aux supply 230V, 45-65 Hz, 5W
    - V,I., Hz, Pf, KVA, KW, KWH
  • Should have ON/OFF Switch panel.
    - ON/OFF, 4 pole 2 way switch, 6A/440V.
  • Should have Variac panel.
    - 0-200V /2A Variac .
  • Should have Lamp Load panel.
    - 3 Lamp Load socket with 100w Bulb .
    1 Phase Transformer 500VA (2Nos)
    - 0-220V Primary input (1x2 socket)
    - 0-110V Secondary output (2x2 socket) .
  • 3 Phase Transformer 500VA.
    - 0-415V Primary input (3x2 socket)
    - 0-415V Secondary output (3x2 socket) .
  • User's manual with experiments.
  • Experiment List:
    - Finding Transformer equivalent circuit.
    - Study of transformer regulation.
    - Measurement of winding temperature.
    - Effect of type of load on transformer output waveform.
    - Three phase transformer connections.
    - Scott connection : Using 2 Nos. of 1phase transformer 3ph. to 2ph. conversion.
    - Parallel Operation on 1 Phase transformer.
    - Effect of variety of three phase connections on regulation and current carrying capacity of transformers.
    - Harmonic cancellation & shift in phasor diagram due to different connections, Working of Teaser transformer
    - Back to back test (sumpner test) on two identical single phase transformers.
You May Like
Not exactly what you want? 1 request, multiple quotations Get Quotations Now >>
You May Like